Major Projects

  • LPG STORAGE & DISTRIBUTION PLANT

    • Client’s Request:
      • Facility Construction, Installation, Pre-Commissioning and Commissioning of 180MT LPG Storage & Distribution Terminal.
    • Location: SW Nigeria – Lagos
    • Highlights:
      • Scope Boundaries: Electrical, Instrumentation & Controls, Mechanical, Civil and Process Engineering
      • 3-D rendering of plant process – using PDMS
      • Designed & Installed entire Fire & Gas Detection system; and Constructed 1000 liter FW Storage Tank
      • Application of appropriate Corrosion Control Mechanism
      • Safety Systems Sizing including, PTs, PSV, BDVs, ESDs etc.
      • Development of All Pre-commission documents, including ‘As-Built’ Drawings and ‘O&M Manuals’
      • 80-20 management of materials’ procurement [local & international] for Project
      • Client’s Personnel Training and Post-Commission Services
    • Duration
      • 24 months
  • FIRE PROTECTION SYSTEMS

    • Client’s Request:
      • Fire Protection Systems
    • Location: SS Nigeria – Edo
    • Highlights:
      • Designed Fire water/fire fighting coverage for plant
      • Designed Fire Water Piping Network,Deluge and Sprinkler Systems
      • Sized, Procured and Installed Fire Water Pumps & Hoses
      • Extended design life of some existing Fire Water lines using Fibre/Glass Reinforced Polymer pipes, to eliminate risk of corrosion
    • Duration
      • 6 months
  • EFFLUENT TREATMENT PLANT

    • Client’s Request:
      • Iterative Evaluation & Laboratory Testing of Water Supply System for 150-unit Housing Estate.
    • Location: SW Nigeria – Lagos
    • Highlights:
      • Conducted Site Surveys to Evaluate ‘As-Is’ Condition of System (including 450 KL Storage Tank and Purification Modules)
      • Executed Process Check on System Efficiency including Piping Capacity Check
      • Collected Water Samples & Analyzed Impurities
      • Carried out Iterative Empirical Tests towards achieving Potable Water Clarity per WHO Standards
      • Developed Integrity Assessment Report for Supporting Equipment
      • Executed Process Check on System Efficiency including Piping Capacity Check
      • Provided Longer-term Strategy for Corrosion Control on Equipment & Quality Control at Distribution Nodes
    • Duration
      • 9 months
  • CRUDE OIL PROCESSING FACILITY

    • Client’s Request:
      • FEED and Detailed Engineering Design for dual 2 x 10,000 BOPD trains of Oil Production facility equipment and piping as well as associated utility and fire fighting systems
    • Location: SS Nigeria – Delta
    • Highlights:
      • Design of process piping systems; including pipe modelling and engineering analysis
      • Client Representative during Factory Acceptance Tests (FATs) for all critical equipment ahead of procurement
      • Managed development of FEED deliverables for crude oil on-loading facilities
      • Developed Project IFC Package -including design basis and calculations and fabrication drawings
      • Equipment/vessels installation, pipe fabrication, construction of crude and fire water storage tanks and complete firefighting system
      • Managed Construction Hook-ups, Commissioning and Start up
    • Duration
      • 7 months
  • CNG DOWNLOADING STATION

    • Client’s Request:
      • Concept,FEED and Detailed Engineering Design for a 2 Mscf /day of CNG (Compressed Natural Gas) comingling station, and its 6” x 5km pipeline for tie-in to PRMS and pipeline networks for potential gas
        offtakers
    • Location: SW Nigeria – Oyo
    • Highlights:
      • Evaluated gas demand for 15 potential off-takers and sized pipeline to suite station capacity and the maximum demand from all potential customer
      • Provided specification for Pressure Reduction and Metering System (PRMS)
      • Performed calculations for design gas loads, pipeline size and wall thickness.
      • Prepared Equipment and Piping Layouts, Pipeline Routes and Profile drawings and Isometrics
    • Duration
      • 9 months